LOGBOOK
Page
two
Farmington fEB-mAR-April 2005
FEBUARY 20, 2005
Left for Farmington 7:00 am arrive Farmington 6:00 PM Left trailer at BP
yard.
February 21, 2005
Met James Walker 6:30am Went to school 8:00am, met Mr. Hutton. He said
school closed for holiday and to show up Wednesday.
Went back to BP office. Saw James and Cliff. Rig up on 316. Went by CDI,
pick up changeover for pump. Went to Tubescope pipe Yard twice. Saw
Craig. Rent U-Haul. Went to Wal Mart for food stock. Saw James mentioned
pipe coupling and dirt.
February 22, 2005
Went to Albuquerque to Zomeworks. Pick up trackers and batteries. Back
to Farmington 3:00 PM. Drop trailer off. Called Cliff.
February 23, 2005
School. Saw Cliff and James
February 24, 2005
School. Met with Cliff and James.
February 25, 2005 6 hours
9:00am Met Bill at Yard. Load trailer. Went to first location 316.
Roustabout unload until 12:15 PM. Went to 397 location. Unload and left
trailer. Left location 2:15PM. Went back to 316, set jack at first site.
Set jack and battery box at 397. Back at room 3:00pm.
February 28, 2005
Met with Bill BP office. Did no work on location. Bought supplies for
jobs. Did prep work for locations.
March 1, 2005 9.5 hours
Met with Bill, James, John, and Andy. Bill getting crew to set up
tracker poles. Loaded battery box and batteries in pickup. On 316
location 9:30am. Set battery box. Set batteries in box and wire 24
volts. Left location 11.25am.Arrive 397 with Andy. Set Batteries and
wired 24 volts. Assemble tracker unit. Pipe for tracker was delivered.
Left location 4:00pm. Back at room 4:45pm.
March 2,2005 10.5 hours
7:00am BP office met with Bill. Dump trash in BP Dumpster. On location
316 8:15am.Excavat0ors on location (Riley Industrial) Jerome and Eric
were the operators. Crane and cement on location 9:00 - 9:20am. Set
pole, dug trench. Left location 11:00am. On 397 location 11:20am. Same
setup. Left location 12:30pm. Lunch with Craig and Danny of CDI. Back on
location 397 3:30pm. Set panels on tracker. Loaded other panels and
tracker for 316. Left location4:45pm. Back at Hotel 5:30 PM.
March 3,2005 6 hours
On 316 location 7:15am. Crane lift tracker and panels on pole. Rig down,
left 316 to 397 11:40am. Rig up on 397 to lift Tracker and panels on
pole. Rig down and left location 12:45pm. Bought parts for systems in
afternoon work on control boxes.
March 4,2005 10.5 hours
On location 316 8:00am. Install electrical lines on both locations (BP
electrical contractors). Setup controls on 316. Left location 5:30pm.
March 5, 2005 3.5 hours
Started to wire panel array. Rained out. Left 11:30AM.
March 7, 2005 10 hours
BP office 7:00am. On location 7:45am. Finish wiring of panel. Hooked up
to battery. Install trash cups on rod and run rod in well. Start system
pumping. Checks stopped up. Left well shut in, back at room 5:00pm.
March 8,2005 11.5 hours
Pulled rod out of well bore, remove traveling valve. Run rod in caught
standing valve, tried to pull standing valve. Failed. Pull rod out and
run valve release stinger to flush tubing and cage. Pull rod out and
remove stinger and run rod back in and caught standing valve. Bumped
standing valve and pulled rod with standing valve. Standing valve full
of sand, dirt and thread dope. Cleaned out and run standing valve in
tubing to pump. Set standing valve in pump seat. Pulled out rod, install
traveling valve to rod and run in well tubing and pump. Shut in. Back at
room 6:45pm.
March 9, 2005 10.5 hours
Set to pump - 2 hours system pumping gas through tubing. Shut down,
start compressor. Started pump and making water. Changed pulleys. Went
to town to pick up water at BP yard. Ordered 8-inch pulley, 41-inch
belt. Left compressor running. Pump jack set at 3.75 strokes a minute.
Pumping 1 pint a minute. Left running, back at room 5:30pm.
March 10, 2005 4 hours
Office 6:45am, on Location 7:20am. Water was pumped off, pressure on
casing, Compressor off. Started compressor, as casing pressure dropped,
water came into well bore and started to be pumped. Changed pumping
configuration through the morning. Left for lunch 11:00am. Back at
3:30pm. All components working.
March 11, 2005
Reset pump stroke on 316 till 11:30am. After lunch we worked on GCU 384.
Pulled rod, traveling valve. Scale in trash cup. Run rod in to release
bottom valve. Failed to release fluid. Left rod on reel. Recommended
pull tubing, run new lined tubing.
March 12,2005
Pick up trailer at BP yard. Went to 316,Jeremy said compressor unit went
down about 4:00am. Was still pumping water. Left pump system alone,
Jeremy started compressor. Left for home9: 30am.
|